Site Supervision & Acceptance of Work

  • Site supervision (Construction Quality and Timetable Assumptions)
  • Interim acceptance
    • Post-shipment inspection (IV/EL) with the mobile laboratory
    • Visual inspection on sample basis of the PV-Plant
    • Measurement on site on sample basis using a IV-Curve tracer and IR camera
  • Final acceptance
    • Visual inspection on sample basis of the PV-Plant
    • Measurement on site on sample basis using a IV-Curve tracer and IR camera
    • Independent BEC-Performance Station for calculation and presentation of the Performance Ratio